Transportation Engineering
|
Project | Warehouse of Viet Hoa Nong Co., Ltd | Location | Can Duoc District, Long An Province | Client | Viet Hoa Nong Co., Ltd | Task | Construction Supervision for Port 2.000T | Year | 2013 | | |  |  |
Project | Gemalink Container Terminal, phase 1 | Location | Tan Thanh District, BR-VT Province | Client | Gemadept-Terminal Link Cai Mep JS. Company (GEMALINK) | Task | Soft Soil Improvement Monitoring Works | Year | 2012 | | |  |  |
Project | Ben Luc – Long Thanh Expressway | Location | Long An Province – HCMC – Dong Nai Province | Client | Corporation of Business Services and Construction Technology | Task | Soil Properties Testing of Package A1, A2, A3 | Year | 2011 | | |  |  |
Project | Road under Ong Lon Bridge | Location | District 7, HCM city | Client | Tan Thuan Investment & Construction Co.,Ltd | Task | Construction Supevision | Year | 2011 | | |  |  |
Project | Domestic Port for barge 300T | Location | Binh Duong Province | Client | Nguyen Ngoc Private | Task | Topographic Survey, Preparation of Basic Design | Year | 2010 | | |  |  |
Project | Road and embankment of Tien river, My Tho city | Location | My Tho city, Tien Giang province | Client | The management board of investment projects for construction of embankment, road and residential areas along the Tien River | Task | Consulting review for road and embankment | Year | 2010 | | |  |  |
Project | Road No.10 Residental Area | Location | Ben Luc District, Long An Province | Client | Tan Thuan Investment & Construction Co.,Ltd | Task | Reviewing for Technical – Detailed Design for road, drainage and waste drainage system | Year | 2010 | | |  |  |
Project | Harmful Waste Treatment Area | Location | Thong Nhat District, Dong Nai Province | Client | SONADEZI. | Task | Preparation of Detailed Design and Cost Estimate | Year | 2010 | | |  |  |
Project | Infrastructure of Electricity Center of Long Phu | Location | Long Phu Town, Soc Trang Province. | Client | Project Management Ltd Company of Petro Gas Electricity No. 2 | Task | Technical review of detailed design drawings of river bank protection dyke & Reclamation | Year | 2009 | | |  |  |
Project | Upgrading Ong Dao Dam & Brigde | Location | Da Lat City | Client | Lam Dong DARD | Task | Reviewing of Technical-Detailed Design | Year | 2009 | | |  |  |
Project | Road No.9 – Phu My 2 IZ | Location | Tan Thanh District, BR-VT Province | Client | Vung Tau Processing Gas Company | Task | Reviewing of Technical - Detailed Design | Year | 2009 | | |  |  |
Project | Sao Mai – Ben Dinh Oil & Gas Services Port | Location | Tay Ninh Province | Client | Meinhardt Vietnam Ltd., Company | Task | Reviewing of Technical - Detailed Design | Year | 2009 | | |  |  |
Project: | Caimep International Terminal (CMIT) | Location: | Baria – Vung Tau province, Vietnam | Client: | Hangdong Engineering Company | Year: | 2008 | | | Services: | - Soil Investigation - Detailed Design for Soft Ground Improvement | | |  |  |
Project: | Caimep International Terminal (CMIT) | Location: | Baria – Vung Tau province, Vietnam | Client: | Posco E&C – Samwhan Joint Venture | Year: | 2008 | | | Services: | - Supply, Installation, Monitoring and Analyses of Soil Improvement Monitoring Works for CMIT project | | |  |  |
Project: | My Xuan Port | Location: | Baria vungtau Province | Client: | Hong Linh Company | Year: | 2008 | Services: | Geotechnical Investigation | | Service |  |  |
Project: | Saigon Port Container Terminal (SPCT) | Location: | Baria – Vung Tau province, Vietnam | Client: | Long Phuong Nam Company | Year: | 2008 | | | Services: | - Supply, Installation, Monitoring and Analyses of Soil Improvement Monitoring Works – Phase 2 - for SCPT project | | Service |  |  |
Project: | Posco Port | Location: | Tan Thanh District, BR-VT Province | Client: | Portcoast Co. | Year: | 2007 | | | Services: | - Detailed Design for Soft Ground Improvement of Road and Yard System | | |  |  |
Project: | SITV Port | Location: | Tan Thanh District, BR-VT Province | Client: | Portcoast Co. | Year: | 2007 | Services: | - Reviewing Engineering Design - Detailed Design for Soft Ground Improvement | | |  |  |
Project: | Sai Gon International Terminal | Location: | Phu My Industrial Zone, Ba Ria – Vung Tau Province | Client: | Meinhardt Viet Nam Co., Ltd | Year: | 2007 | Services: | - Review of Geotechnical Investigation - Ground Improvement Design | | Service |  |  |
Project: | The 2nd Van Thanh Bridge Rehabilitation | Location: | Binh Thanh District, HCMC | Client: | Urban Traffic Management Unit No. 1. | Year: | 2007 | | | Services: | Geotechnical Investigation | | Service |  |  |
Project: | Access Roads of LFS, LBV, GDS - PM 3 Ca Mau Gas Pipeline | Location: | Ca Mau Province | Client: | Vietsovpetro Joint – Venture Company | Year: | 2007 | Services: | Detailed Design | | |  |  |
Project: | Thu Thiem Tunnel | Location: | District 2, HCMC | Client: | Obayashi Corporation | Year: | 2006 | Services: | Foundation Treatment Analysis for Tunnel Casting Yard | | Service |  |  |
Project: | Water Pipe Protection Bridge – HCMC East West Highway | Location: | District 2, HCMC | Client: | Pacific Consultants International | Year: | 2006 | Services: | - Technical Design - Detailed Design | | Service |  |  |
Project: | Hanoi Interchange - HCMC East-West Highway | Location: | District 2, HCMC | Client: | Obayashi Corporation | Year: | 2005 - 2006 | Services: | Detailed Design | | Service |  |  |
Project: | Water Pipe Protection at Ca Tre Nho Bridge – HCMC East West Highway | Location: | District 2, HCMC | Client: | Obayashi Corporation | Year: | 2005 - 2006 | Services: | Technical Design | | Service |  |  |
|
|