Project | Nhieu Loc – Thi Nghe Flood Control Sluice Gate | Location | Districts of Binh Thanh & 1, HCMC | Owner | HCMC Steering Center of the Urban Flood Control Program (SCFC) | Client | | Descriptions | • This is one of main components of the flood control project for right bank of Sai Gon, Nha Be, and Soai Rap river of HCMC (plan of urban flood control of HCM city, decision No. 1547/QĐ-TTg). • The main function of the project is to control the high tidal meter level and to drain the rain water by pumping for flooding control of an area of about 33,000 ha. • Gate width: W = 2 x 22.5m. | Services | • Preparation of Feasibility Study • Preparation of Basic Design | Contract value | VND 492,373,000 (USD 27,661) | Duration | July 2009 – November 2009 | | |  |  |
Project | Phu Xuan Flood Control Sluice Gate | Location | District 7 & Nha Be, Ho Chi Minh city | Client | 1547 Project Management Board | Task | Reviewing of Feasibility Study | Year | 2013 | | |  |  |
Project | Ong Dung Flood Control Sluice Gate | Location | District 12, Ho Chi Minh city | Client | Ba Bo Project Management Board | Task | Reviewing of Detailed Design and Cost Estimation | Year | 2013 | | |  |  |
Project | Tan Thuan Flood Control Sluice Gate | Location | District 4 & 7, Ho Chi Minh City | Client | TEAM Consulting Engineering and Management Co., Ltd. | Task | Review of master plan flood protection, Feasibility Study, and Detalled Design | Year | 2013 | | |  |  |
Project | Tri Yen & Ong Hieu Sluice | Location | Long An Province | Client | Long An DARD | Task | Reviewing of Detailed Design & Cost Estimation | Year | 2012 | | |  |  |
Project | Song Ray Reservoir | Location | BR-VT Province | Client | Investment & Construction of Water Resources Management Board No.9 | Task | Supply and Installation Instruments for main dams | Year | 2010 | | |  |  |
Project | Ong Tung Sluice | Location | Tien Giang Province | Client | Tien Giang Agriculture Project Management Board | Task | Topographic Survey, Soil Investigation and Preparation of Technical-Detailed Design | Year | 2009 | | |  |  |
Project | Upgrading Suoi Tre Reservoir | Location | Long Khanh town, Dong Nai Province | Client | Dong Nai Agriculture Project Management Board | Task | Reviewing of Technical-Detailed Design | Year | 2009 | | |  |  |
Project: | Cau Moi Reservoir Project | Location: | Dong Nai Province | Client: | Dong Nai Agriculture Project Management Board | Year: | 2009 | Services: | Supply, Installation and Monitoring for Instrumentation System Cost | | Service |  |  |
Project: | Canal System of Song Ray Reservoir | Location: | Ba Ria – Vung Tau Province | Client: | Ba Ria Vung Tau Irrigation Project Management Board | Year: | 2007-2009 | Services: | - Reviewing Technical Design - Reviewing Cost Estimation | | Service |  |  |
Project: | Da M’lo Hydro – Power Station | Location: | Bu Dang District, Binh Phuoc province,Vietnam. | Client: | Tay Nguyen Hydro-Power J.S Company | Year: | 2007-2008 | | | Services: | - Topographic survey - Geotechnical investigation - Preparing investment project - Engineering design – Cost estimation | | |  |  |
Project: | Cau Moi Reservoir Project | Location: | Dong Nai Province | Client: | Dong Nai Agriculture Project Management Board | Year: | 2007 | Services: | - Design of Grouting under Intake - Detailed Design for Instrumentation System Cost | | Service |  |  |
Project: | Madagui Reservoir | Location: | Lam Dong Province | Client: | Sai Gon – Madagui Tourist J.S. Company | Year: | 2006-2007 | Services: | - Reviewing Technical - Detailed Design - Cost Estimation | | Service |  |  |
Project: | Upgrading Suoi Tre Reservoir | Location: | Long Khanh town, Dong Nai Province | Client: | Dong Nai Agriculture Project Management Board | Year: | 2006-2007 | Services: | - Topographic Survey - Geotechnical Investigation - Preparation of Feasibility Study - Reviewing Feasibility Study Report | | Service |  |  |
Project: | Cau Moi Reservoir - Main Embankment | Location: | Dong Nai Province | Client: | 40 Construction Joint Stock Company | Year: | 2005-2007 | Services: | - Technical Design for the Filter - Reviewing Feasibility Study Report | | Service |  |  |
Project: | Chu Prong Reservoir | Location: | Gia Lai Province | Client: | 47 Construction JS Company | Year: | 2006 | Services: | Supply and Installation of Geotechnical and Hydrological Instrumentation. | | Service |  |  |
Project: | Dak Kar Hydro – Power Station | Location: | Dak Nong province,Vietnam | Client: | Cosevco Phuong Nam Investment & Construction Consultants Co. | Year: | 2005-2006 | | | Services: | - Topographic survey - Geotechnical investigation - Preparing investment project - Engineering design – Cost estimation | | |  |  |
Project: | An Vien Barrage | Location: | Bau Xeo IZ, Trang Bom District, Dong Nai Province | Client: | Van Thanh Construction – Trade Co., Ltd 2D , Trang Dai Ward, Bien Hoa, Dong Nai Province | Year: | 2005 | Project description: | - The primary objective for this project is supply raw water of 10.000 m3/ day for Bau Xeo IZ, Dong Xoai | Services: | - Hydrology Investigation and Analysis | | Service |  |  |
Project | Dau Tieng Sluice No.2 Hydro-Power Station | Location | Tay Ninh Province,VN | Client | Hoang Viet Trading – Produce - Service Co., Ltd | Task | - Topography Survey - Geotechnical Investigation - Preparing investment project - Engineering – Construction Design - Estimation cost | Year | 2005 | | |  |  |
Project: | Lo Ren Drainage | Location: | Nhon Trach District, Dong Nai Province | Client: | Dong Nai Agriculture Project Management Board Dong Khoi streer, Tan Hiep ward, Bien Hoa city, Dong Nai province | Year: | 2005 | Project description: | Rain-water, waste water drainage for Nhon Trach IZ of 1.000 ha area | Services: | - Topography Survey - Geotechnical Investigation - Engineering - Construction Design - Cost Estimation | | Service |  |  |
Project: | North Vam Nao Water Control Project | Location: | An Giang Province | Client: | Working office for Australian contractor in An Giang – Representing-KBR PTY Ltd | Year: | 2005 | Services: | - Geotechnical Investigation - Engineering – Construction Design - Cost Estimation | | Service |  |  |
Project: | Loc An Inundation Prevention Reservoir | Location: | Long Thanh District, Dong Nai Province | Client: | Dong Nai Agriculture Project Management Board Dong Khoi street, Tan Hiep ward, Bien Hoa city, Dong Nai Province | Year: | 2005 | Project description: | Reduce flood for Long Thanh town Water 300 ha vegetables and crops | Services: | Appraising Engineering – Construction Design, Cost Estimation | | Service |  |  |
Project: | Thu Dau Mot Drainage System – Phase 2 | Location: | Thu Dau Mot Town, Binh Duong Province | Client: | Water Supply – Environment Project Management Board | Year: | 2005 | Services: | - Appraising Engineering - Construction Design - Cost Estimation | | Service |  |  |
Project: | Chau Pha – Song Xoai Irrigation. | Location: | Ba Ria – Vung Tau Province, Vietnam | Client: | DARD of Ba Ria – Vung Tau Province. | Year: | 2004 | Project description: | - Irrigation area of 500ha - Water Supply for 2,500 people - Rural Infrastructure Development - Social and Environment Improvement
| Services: | - Preparation of the technical Proposal - Topography Survey, Geotechnical Investigation - Hydrology Investigation and Analysis - Water Balance Analysis - Primary design of head sluice. - Estimation of project cost | | |  |  |
Project: | Rehabilitation of An Nhut Co-operative Canal System | Location: | Long Dien District, BR – VT Province | Client: | Long Dien Project Management Board | Year: | 2004 | Services: | Preparation of Feasibility Study | | Service |  |  |
Project: | Ea Soup Reservoir Daklak Province | Location: | DakLak Province | Client: | 413 Irrigation Project Management Board 163 Nguyen Van Cu street, Buon Ma Thuot city, Daklak province | Year: | 2004 | Services: | Design, supply and installation of Rain gauge | | Service |  |  |
Project: | Rehabilitation of Long Dien Co-operative Canal System | Location: | Long Dien District, BR – VT Province | Client: | Long Dien Project Management Board | Year: | 2004 | Services: | Preparation of Feasibility Study | | Service |  |  |
Project: | Dau Tieng Sluice No.1 Hydro-Power Station | Location: | Tay Ninh Province | Client: | B2T New Technology Joint Stock Company | Year: | 2004 | Services: | Engineering design - Cost estimation | | |  |  |
Project: | Suoi Lup Reservoir | Location: | Chau Duc District, Ba Ria – Vung Tau Province | Client: | Ba Ria Vung Tau Irrigation Project Management Board | Year: | 2004 | Project description: | The primary objective for this project is to supply the people with surface water for irrigation and rural water supply. Supply water 5000 m3/day Landscape, Ecologic Environment Improvement for Ngai Giao town | Services: | - Topography Survey - Geotechnical Investigation - Preparing feasibility study document | | Service |  |  |
Project: | Say Stream Water Resources. | Location: | Ba Ria – Vung Tau Province, Vietnam | Client: | DARD of Ba Ria – Vung Tau Province. | Year: | 2004 | Project description: | - Irrigation area of 180ha - Water Supply for 900 people - Rural Infrastructure Development - Social and Environment Improvement | Services: | - Preparation of the technical Proposal - Topography Survey - Geotechnical Investigation - Hydrology Investigation and Analysis - Social and Resettlement Investigation and Report - Environment Impact Assessment - Water Balance Analysis - Primary design of headwork’s (dam, spillway, in taker). - Layout for irrigation scheme - Estimation of project cost - Preparation of Feasibility Study Report | | |  |  |
Project: | Dau Tieng Sluice No.1 Hydro-Power Station | Location: | Tay Ninh Province | Client: | B2T New Technology Joint Stock Company | Year: | 2003 - 2004 | | | Services: | - Topographic survey, - Geotechnical investigation and Preparing feasibility study document | | |  |  |
Project: | Dinh River Lower Section Dam | Location: | Phan Rang Thap Cham Town, Ninh Thuan Province | Client: | Agriculture Project Management Board | Year: | 2003 | Project description: | Prevent salt, keep freshwater in dry season in order to support irrigation water, running water, landscape environment improvement for Phan Rang Thap Cham town | Services: | Appraising foundation design | | Service |  |  |
Project: | Song Mong Reservoir | Location: | Ham Thuan Nam District, Binh Thuan Province | Client: | DARD of Binh Thuan Province. | Year: | 2003 | Project description: | The primary objective for this project is to supply the people with surface water for irrigation and rural water supply. | Services: | - Appraising Engineering Design - Cost Estimation | | Service |  |  |
Project: | Song Tho Irrigation Barrage | Location: | Binh Thuan Province, Vietnam | Client: | Phan Ri-Phan Thiet Irrigation Project Management Board | Year: | 2003 | | | Services: | - Topographic survey - Geotechnical investigation - Engineering design – Cost estimation | | |  |  |
|
|